Schedule risk model of water intake tunnel construction considering mood factors and its application.
Article in Scientific reports, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed, 5 citations in OpenAlex.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
12 authors at 3 institutions in 1 country.
Funding
Abstract
The mood index [Formula: see text] was used to describe evaluator attitudes regarding the progress of a project that formed the basis of a construction period prediction model. The degrees of pessimism [Formula: see text] and optimism [Formula: see text] were introduced, and an analysis model was established using [Formula: see text] and [Formula: see text] to predict the construction period and completion probability Firstly, the absolute construction period of each process of tunnel No. 2 can be obtained according to the measured daily average footage of each process of tunnel No. 1. Secondly, the probability of the stoppage caused by different factors can be obtained after the statistical analysis of the factors responsible for the stoppage of tunnel No. 1. Finally, the expected construction period and completion probability of tunnel No. 2 under different pessimism and optimism conditions are obtained by using the progress risk analysis theory of emotional models and the program evaluation and review technique method. An engineering application showed that the expected construction period increased, and the completion probability decreased considerably with increasing pessimism; the opposite trend occurred as optimism increased. During the process of risk management and control, the prediction model can be used to perform precise quantitative analysis of the expected construction period and completion probability, reduce the blindness of construction management, control decisions of complex giant tunnel projects, and provide a more accurate basis for decision makers to judge risks. The findings of this study can be applied to hydraulic tunnels and can provide a reference for traffic tunnels, railway tunnels, and other similar projects.