ArticleInternational health2025
Deployment of vaccine cold chain equipment in resource-limited settings: lessons from the Gavi Cold Chain Optimization Platform in Cameroon.
Article in International health, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. An erratum has been issued. Cited by 5 papers, 1 of them a synthesis that pooled it.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
5 citing papers in PubMed, 1 synthesis or guideline pooled it.
- Measles vaccine effectiveness in African children: a systematic review and meta-analysis.BMC infectious diseases · 2024Pooled it
- Review
- Trends in the global burden of childhood meningitis between 1990 and 2021 and projections to 2035: based on the global burden of diseases database 2021.BMC public health · 2025Article
- Review
- Epidemiological investigation of measles outbreak in a refugee settlement in Lamwo District, Uganda.The Pan African medical journal · 2025Article
Corrections and comments
- Erratum issued
Authors and funding
14 authors.
Funding
Abstract
backgroundLack of or use of suboptimal cold chain equipment (CCE) is a major barrier to optimal immunization coverage and equity. Gavi established the CCE optimization platform (CCEOP) in 2015 to help eligible countries modernize their cold chain systems. However, there are limited data on CCE deployment at country level. We present lessons learnt from deploying CCE from the Gavi CCEOP in Cameroon.
methodsThis cross-sectional study collected data on the number of days items of CCE spent at each point on their trajectory from the entry port to 62 randomly selected health facilities in Cameroon.
resultsOnce equipment arrived at the entry port, it took 10 d for customs clearance, 2 d from customs clearance to warehousing and 257 d (>9 mo) from the warehouse to facilities. Upon arrival at the facilities, it took a median of 53 (range 0-395) d from installation to final commissioning: most of the days (median=210) were spent between installation and final commissioning. The major causes of delays included insufficient coordination and communication across all levels, poor documentation and final commissioning.
conclusionEarly engagement on customs clearance, strengthening coordination and communication, ensuring proper documentation, as well as eliminating final commissioning, could significantly improve implementation of the program.