Evidence map›Paper›PMID 38277415›Full record

ArticlePloS one2024

Multi-objective optimization of dual resource integrated scheduling problem of production equipment and RGVs considering conflict-free routing.

Qinglei Zhang, Jing Hu, Zhen Liu, Jianguo Duan

Abstract read
In one paragraph

Article in PloS one, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.

0numbers the graph read from it
0cells of the map it votes in
2citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

2 citing papers in PubMed.

  1. Article
  2. Article
4 · The record

Corrections and comments

5 · Who and what money

Authors and funding

4 authors.

Qinglei ZhangChina Institute of FTZ Supply Chain, Shanghai Maritime University, Shanghai, China.
Jing HuInstitute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai, China.ORCID 0009-0006-0440-0118
Zhen LiuInstitute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai, China.
Jianguo DuanChina Institute of FTZ Supply Chain, Shanghai Maritime University, Shanghai, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

In flexible job shop scheduling problem (FJSP), the collision of bidirectional rail guided vehicles (RGVs) directly affects RGVs scheduling, and it is closely coupled with the allocation of production equipment, which directly affects the production efficiency. In this problem, taking minimizing the maximum completion time of RGVs and minimizing the maximum completion time of products as multi-objectives a dual-resource integrated scheduling model of production equipment and RGVs considering conflict-free routing problem (CFRP) is proposed. To solve the model, a multi-objective improved discrete grey wolf optimizer (MOID-GWO) is designed. Further, the performance of popular multi-objective evolutionary algorithms (MOEAs) such as NSGA-Ⅱ, SPEA2 and MOPSO are selected for comparative test. The results show that, among 42 instances of different scales designed, 37, 34 and 28 instances in MOID-GWO are superior to the comparison algorithms in metrics of generational distance (GD), inverted GD (IGD) and Spread, respectively. Moreover, in metric of Convergence and Diversity (CD), the Pareto frontier (PF) obtained by MOID-GWO is closer to the optimal solution. Finally, taking the production process of a construction machinery equipment component as an example, the validity and feasibility of the model and algorithm are verified.

Indexed as

AlgorithmsBiological Evolution

Identifiers

PMID38277415
PMCPMC10834064

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.