ArticleScientific data2023
High-resolution electric power load data of an industrial park with multiple types of buildings in China.
Article in Scientific data, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 5 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
5 citing papers in PubMed.
- Real-world energy data of 200 feeders from low-voltage grids with metadata in Germany over two years.Scientific data · 2026Article
- High-resolution energy data from a sustainable industrial production area in Karlsruhe.Scientific data · 2026Article
- A Large-Scale Residential Load Dataset in a Southern Province of China.Scientific data · 2025Article
- A multi-year campus-level smart meter database.Scientific data · 2024Article
- High-resolution electric power load data of an industrial park with multiple types of buildings in China.Scientific data · 2023Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
4 authors.
Funding
Abstract
Considering the growing demand for electricity in industrial parks, understanding their electric power load patterns is critical for improving energy efficiency and ensuring the rational utilization of energy resources. However, the detailed electric power load data of various buildings in industrial parks are rarely available and accessible, which hinders the related studies. In this context, we present the electric power load data of 6 years (from January 1, 2016 to December 31, 2021) for various types of buildings in an industrial park in Suzhou, China. The data are obtained from smart meters and have various time resolutions (i.e., 5 minutes, 30 minutes, and 1 hour). This work describes the data collection, processing process, and different imputation methods. The high-resolution electric power load data can be used for various research tasks, including load prediction, load pattern recognition, anomaly detection, and demand response strategy development.
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.