Evidence map›Paper›PMID 37876420›Full record

ArticleHeliyon2023

A total productive maintenance & reliability framework for an active pharmaceutical ingredient plant utilising design for Lean Six Sigma.

Noel Shannon, Anna Trubetskaya, Javed Iqbal, Olivia McDermott

Abstract read
In one paragraph

Article in Heliyon, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Review
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Noel ShannonDepartment of Engineering, University of Limerick, Limerick, Ireland.
Anna TrubetskayaDepartment of Engineering, University of Limerick, Limerick, Ireland.
Javed IqbalDepartment of Engineering, University of Limerick, Limerick, Ireland.
Olivia McDermottCollege of Science and Engineering, University of Galway, Galway, Ireland.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

This research investigates the requirement for and relationship and implementation of a total productive maintenance (TPM) and Reliability Centred Maintenance (RCM) strategy within an Active Pharmaceutical Ingredient (API) Plant. This research aimed to study the tools and techniques of TPM and Reliability Engineering and then deploy a designed model to an API plant. A case study involving Design for Lean Six Sigma phases of Define, Measure, Analyse, Design, and Verify was utilised to build an API site TPM pilot program. Data was collected using interviews across Company 'X's local and Global Engineering teams. Process runtime, downtime and plant availability metrics were compiled and a new design for Total Productive Maintenance and Reliability was proposed and verified. A maintenance framework was designed to optimally incorporate Total Productive Maintenance, Reliability and Operational Excellence with an emphasis on Overall Equipment Efficiency (OEE) realizing a 33 % reduction in planned maintenance activities, a 70 % reduction in Corrective Maintenance, Cleaning for Maintenance was reduced by 50 %, the pilot maintenance area of the centrifuge has its OEE increased by 20 % and plant availability increased by two hundred and 6 h. This research highlights the importance of Total Productive Maintenance as a key component of an effective maintenance strategy and its potential to transform maintenance practices. Based on this research and results, TPM is recommended to be applied to any API manufacturing organization. A limitation of the study is that it is a single-site case study. The novelty of this research is based upon the emphasis on Reliability Engineering to remove non-value add Maintenance time from the manufacturing schedule. The Total Productive Maintenance & Reliability model designed and implemented in this research is unique in the literature and can be leveraged by engineering professionals and academics to understand the benefits of TPM.

Indexed as

Autonomous maintenanceLean Six SigmaMaintenance strategyManufacturing excellenceOperator careOverall equipment effectiveness (OEE)Total productive maintenance

Identifiers

PMID37876420
PMCPMC10590851

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.