ArticleBMJ open quality2023
Implementation of a quality management system in a liver transplant programme.
Article in BMJ open quality, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
1 citing paper in PubMed.
- An overview of Synlab SDN Biobank's quality control system.Scientific reports · 2024Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
9 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
backgroundThe management of liver transplantation has become a complex process involving different healthcare professionals. Teamwork, standardisation and definition of the best practices are essential for success, patient satisfaction and society's favourable perception of transplantation programmes.ISO 9001:2015 certification provides the necessary elements to help implement a quality management system (QMS) to ensure that patient care is performed with the highest guarantees of clinical quality and safety. The aim of this study is to describe the steps, strengths and limitations in the implementation of a QMS in a liver transplant programme (LTP). PROJECT MANAGEMENT
methodThis included analysing the starting point, setting up a working group, training, defining the scope of certification, preparing documentation, and conducting an internal and external audit, which culminated in the ISO 9001 quality certification award. The scope of QMS includes all the processes of LTP, from referral of candidates to long-term follow-up after transplantation.
resultsThe project was structured in seven phases that took place between 2008 and 2011. The implementation of QMS led to the generation of all the necessary documentation to meet the requirements of the standard, including internal and legal requirements related to the transplant activity. The establishment of indicators to measure the effectiveness of processes, risk management and the identification of incidents allows us to implement measures devoted to avoiding the deficiencies and to meet the established objectives.
conclusionISO 9001:2015 certification has contributed to the adaptation of a new quality and safety culture focused on the patient. All activities are protocolised, everything is recorded, measured, and verified, and all steps are taken as planned. Work is carried out in terms of continuous improvement. This has led to less variability in daily clinical practice and a better understanding of work dynamics.