Research on the risk transmission mechanism of international construction projects based on complex network.

Yanjun Huangfu, Jingrong Xu, Yang Zhang, Dechun Huang, Jiahui Chang

Abstract read
In one paragraph

Article in PloS one, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.

0numbers the graph read from it
0cells of the map it votes in
2citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

2 citing papers in PubMed.

  1. Article
  2. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors.

Yanjun HuangfuBusiness School, Hohai University, Nanjing, Jiangsu, China.
Jingrong XuJiangsu Provincial Collaborative Innovation Center of World Water Valley and Water Ecological Civilization, Nanjing, Jiangsu, China.ORCID 0000-0002-7938-6094
Yang ZhangBusiness School, Hohai University, Nanjing, Jiangsu, China.
Dechun HuangBusiness School, Hohai University, Nanjing, Jiangsu, China.
Jiahui ChangBusiness School, Hohai University, Nanjing, Jiangsu, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The risk transmission process between international construction projects largely contributes to the dilemma of risk management of international construction projects. Firstly, this paper adopts methods such as literature review and brainstorming to identify the risks in international construction projects from all aspects and all stages. Connections between risks is built by the Delphi method and further construct the international construction project risk network. Combined with "ucinet", a network visualization analysis tool, overall feature parameters and local feature parameters are presented for analysis as the focus. Starting from this, the risk transmission in complex construction projects is analyzed to identify key risks and transmission relationships and reveal inherent laws of risk transmission. Accordingly, when formulating risk prevention strategies for international engineering projects, it is proposed that measures to curb risk transmission should be effectively adopted from both key risks and their transmission relationships.

Indexed as

Construction IndustryRisk Management

Identifiers

PMID37582073
PMCPMC10426995

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.