ArticleThe Pan African medical journal2023
Accelerating HIV and AIDS services delivery in Kigoma region, Tanzania.
Article in The Pan African medical journal, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
2 citing papers in PubMed.
- Building research capacity to adapt and develop Patient-Reported outcome measures in low- and middle-income countries: results from a psychometrics workshop in Tanzania.BMC health services research · 2025Article
- Understanding the impact of the COVID-19 pandemic on HIV/AIDS care and management in Tanzania: challenges, adaptations and lessons learnt-a review.BMJ public health · 2024Review
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
7 authors.
Funding
Abstract
Introduction: Tanzania Commission for AIDS and UNAIDS reports 1.7 million Tanzanians are HIV-positive. The Joint United Nations Program on HIV/AIDS set 95%, 95% 95% targets to be achieved by 2025. An assessment was done to understand the region's position, which found the underperformance of critical HIV and AIDS indicators. This prompted the region to accelerate HIV interventions by providing frontline healthcare providers with skills and knowledge, essential equipment, and other infrastructure, after which the assessment of the indicators was conducted to document the outcome of interventions. Methods: we conducted a descriptive study in Kigoma region in June 2022 by comparing HIV and AIDS indicators performance in the pre-intervention and post interventions arms. High-volume CTCs were purposefully selected. We used a pre-tested checklist to assess new HIV-positive on antiretroviral (ARV), pregnant women living with HIV on ARV, and people living with HIV offered multi-month dispensing. We further assessed HIV viral load (HVL) specimen collection, HIV suppression status, and HVL test results turnaround time. We cleaned the information using an MS Excel sheet and tabulated results using STATA software version 13. Results: we assessed 27 care and clinics. The proportion gain in the index client elicitation was 13%. Sexual partners mentioned during index client elicitation had an increase of 145 individuals. The yield among consented sexual partners gained by 14%. The ARV initiation among new HIV -positive and pregnant women living with HIV gained a proportion of 2%. Multi-month dispencing was found to have an 8% increase. The turnaround time for HVL test results decreased by 21 days, and the viral load suppression status increased by 4%. Conclusion: the assessment demonstrated the accelerated HIV and AIDS service delivery due to implementing a comprehensive package of HIV and AIDS management. We recommend in-service capacity building regarding training, basic equipment, and infrastructure.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.