ArticleCase studies in chemical and environmental engineering2022
Application of virtual product design to the development of HVAC solution for Incheon International Airport Modular COVID-19 testing center.
Article in Case studies in chemical and environmental engineering, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed, 2 citations in OpenAlex.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
5 authors at 2 institutions in 2 countries.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Owing to the spread of COVID-19, the need for an inspection center that can quickly determine whether travelers using the airport are infected has emerged. For rapid determination, not only polymerase chain reaction tests but also antigen-antibody tests and on-site analysis systems are required. However, because it is time- and cost-intensive to construct a building that meets the standards for negative pressure facilities, modular negative pressure facilities are being installed as alternatives. Existing negative pressure facilities have problems such as increased energy consumption due to outdoor air load and condensation due to differences in indoor and outdoor temperatures and humidities caused by excessive external air inflow to achieve the target negative pressure and air change rate (ACH). In addition, owing to the installation of additional devices, additional construction is required to use them for other purposes in the future. To solve these problems, in this study, energy recovery ventilation (ERV) was employed to develop a heating, ventilation and air conditioning (HVAC) solution for the Incheon International Airport COVID-19 Testing Center. To shorten the development period, virtual product design (VPD) using computational fluid dynamics analysis-based design of experiments was performed. Owing to the application of VPD, the Incheon International Airport Modular COVID-19 Testing Center was completed in 2 weeks. The target pressure was measured in all spaces by applying the optimal conditions derived through VPD. In addition, owing to the application of ERV, the ACH of an airborne infectious isolation room exceeded the value suggested by international organizations.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.