Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context.
Article in Heliyon, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed, 8 citations in OpenAlex.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
3 authors at 1 institution in 1 country.
Funding
No grant is acknowledged in the PubMed record.
Abstract
The COVID-19 disease has caused a drastic stoppage in the construction industry as a result of quarantines. For this reason, this study focuses on the workforce scheduling problem when working under COVID labor distancing constraints, and additional costs derived from deviation hours or hiring new employees that managers must assume on a project due to circumstances. A multi-objective mixed integer linear programming model was developed and solved using weighting and epsilon constraint methods to evaluate workforce scheduling and the mentioned COVID costs. The first objective function corresponds to the sum of the total extra hours; the second objective function represents the total non-worked but paid hours. Two sets of experiments are presented, the first based on a design of experiments that seeks to determine the relationship between the proposed objective functions and a methodology to determine the cost of considering COVID constraints. The second set of experiments was applied in a real company, where the situation without COVID vs with COVID, and without allowing extra hours vs with COVID allowing extra hours were compared. Obtained results showed that hiring additional employees to the man-crew leads the company to increase the extra hours cost up to 104.25%, being more convenient to keep a workforce baseline and to pay extra hours costs. Therefore, the mathematical model could represent a potential tool for decision-making in the construction sector, regarding the effects of COVID-19 costs on workforce scheduling construction projects. Consequently, this work contributes to the construction industry by quantifying the impact of COVID-19 constraints and the associated costs, offering a proactive approach to address the challenges posed by the COVID-19 pandemic for the construction sector.