Application and planning of an energy-oriented stochastic disassembly line balancing problem.

Xuesong Zhang, Hao Zhou, Chenxi Fu, Menghan Mi, Changshu Zhan, Duc Truong Pham, Amir M Fathollahi-Fard

Abstract read
In one paragraph

Article in Environmental science and pollution research international, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

7 authors.

Xuesong ZhangTransportation College, Northeast Forestry University, Harbin, 150040, China.
Hao ZhouSchool of Mechanical Engineering, Shandong University of Technology, Zibo, 255000, China.
Chenxi FuSchool of Foreign Languages, Dalian Maritime University, Dalian, 116000, China.
Menghan MiTransportation College, Northeast Forestry University, Harbin, 150040, China.
Changshu ZhanTransportation College, Northeast Forestry University, Harbin, 150040, China. zhchsh3@nefu.edu.cn.
Duc Truong PhamDepartment of Mechanical Engineering, University of Birmingham, Birmingham, B15 2TT, UK.
Amir M Fathollahi-FardPeter B. Gustavson School of Business, University of Victoria, 1700, Victoria, BC, V8P5C2, Canada.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

End-of-life (EOL) products are getting more and more attention as a result of the rapid decline in environmental resources and the dramatic rise in population at the moment. Disassembly is a crucial step in the reuse of EOL products. However, the disassembly process for EOL products is highly uncertain, and the disassembly planning method may not produce the anticipated outcomes in actual implementation. Based on the physical nature of the product disassembly process with multiple uncertain variables, certainty disassembly cannot adequately characterize the uncertain variables effectively. Uncertainty disassembly takes into account the changes in parts caused by product use, such as wear and corrosion, which can better coordinate the arrangement of disassembly tasks and better match the actual remanufacturing process. After analysis, it was found that most of studies on uncertain disassembly focus on the economic efficiency perspective and lack of energy consumption considerations. For the gaps in the current study, this paper proposes a stochastic energy consumption disassembly line balance problem (SEDLBP) and constructs a mathematical model of SEDLBP based on the disassembly of spatial interference matrix, In this model, the energy consumption generated by the disassembly operation and workstation standby is not a constant value but is generated stochastically in a uniformly distributed interval. In addition, an improved social engineering optimization algorithm that incorporates stochastic simulation (SSEO) is proposed in this paper to effectively address the issue. The incorporation of swap operators and swap sequences in SSEO makes it possible to solve discrete optimization problems efficiently. A comparison of a case study with some well-tested intelligent algorithms demonstrates the efficacy of the solutions produced by the proposed SSEO.

Indexed as

Disassembly line balancing problemEnergy consumptionGreen manufacturingStochastic simulation methodUncertainty

Identifiers

PMID37222888
PMCPMC10205562

What OpenQuestion holds

Textmetadata
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.