ArticleLandscape architecture frontiers2022
Reducing Threats From Contamination and Flood Damage:Restoring the Brandywine Creek Edge in Wilmington, Delaware, USA.
Article in Landscape architecture frontiers, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
1 citing paper in PubMed.
- Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
4 authors.
Funding
Abstract
Located in Wilmington, Delaware, along the shoreline of the Brandywine Creek in the Greater Philadelphia/Delaware River Watershed, this project responds to a specific and critical need for the site as prioritized by multiple stakeholders. The project applies an innovative approach for quantifying increased flood resilience while simultaneously reducing contamination levels through the implementation of green infrastructure. To solve joint issues related to increased flood risk concurrent with higher potential for exposure to environmental contaminants transported in flood waters from adjacent industrial sites, brownfields, and combined sewer overflows, the research team develops a phased approach to decreasing stormwater runoff and pollutant loads on a 130-acre (52.6 hm2) site along the Brandywine Creek, applying the Long-Term Hydrologic Impact Assessment (L-THIA) model to quantify design impacts and performance of a master plan. Overall, the proposed master plan can reduce stormwater runoff and pollutant loads to levels significantly less than existing conditions or the current land use plan. Further, this research is unique in that it uses outputs from the L-THIA to compare existing conditions, effects of the current comprehensive plan, and impacts related to the proposed neighborhood-scaled master plan to evaluate the effectiveness between each scenario.
Indexed as
Identifiers
37152358PMC10162708What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.