Study on web pillar failure mechanism during auger mining and its associated risk assessment.

Juyu Jiang, Jianxiong Sun, Dong Wang, Ye Lu, Mingxiang Cai, Lei Li

Abstract read
In one paragraph

Article in Scientific reports, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

6 authors.

Juyu JiangCollege of Mining Liaoning Technical University, Fuxin, 123000, Liaoning, China.
Jianxiong SunCollege of Mining Liaoning Technical University, Fuxin, 123000, Liaoning, China. sjx_jason134@126.com.
Dong WangCollege of Mining Liaoning Technical University, Fuxin, 123000, Liaoning, China.
Ye LuCollege of Mining Liaoning Technical University, Fuxin, 123000, Liaoning, China.
Mingxiang CaiGuoneng Xinjiang Zhundong Energy Co., Ltd., Changji, 831100, Xinjiang, China.
Lei LiChina Coal Technology and Industry Energy Technology Development Co., Ltd., Beijing, 100029, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

To safely and efficiently recover trapped coal under final endwalls in open cut mines, theoretical analysis and numerical calculation were used to study the stability of web pillar during auger mining. The partial ordered set (poset) evaluation model was used to develop a risk assessment methodology, and auger mining at Pingshuo Antaibao open cut coal mine was used as a field example for validation. Based on the catastrophe theory, the failure criterion of web pillar was established. From the limit equilibrium theory, the maximum allowable plastic yield zone width and minimum web pillar width were proposed under various Factor of Safety (FoS) thresholds. This in turn provides a new method for web pillar design. Based on the poset theory and combining with the risk evaluation and proposed hazard levels, input data were standardized and weighted. Subsequently, the comparison matrix, HASSE matrix and HASSE diagram were established. The study shows that: when the width of the plastic zone of web pillar exceeds 88% of the total width, web pillar may be unstable. Based on the calculation formula for the required width of web pillar, the required pillar width was 4.93 m and it was deemed as "mostly stable". This was consistent with the field condition on site. Such that this method was validated.

Identifiers

PMID37142623
PMCPMC10160074