Evidence map›Paper›PMID 37079540›Full record

ArticlePloS one2023

Transaction decision optimization of new electricity market based on virtual power plant participation and Stackelberg game.

Jinpeng Yang

Abstract read
In one paragraph

Article in PloS one, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.

0numbers the graph read from it
0cells of the map it votes in
2citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

2 citing papers in PubMed.

  1. Article
  2. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

1 author.

Jinpeng YangSchool of Harbin Institute of Technology, Harbin Heilongjiang, Harbin, China.ORCID 0009-0006-7651-1933

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

This study intends to optimize the trading decision-making strategy of the new electricity market with virtual power plants and improve the transmission efficiency of electricity resources. The current problems in China's power market are analyzed from the perspective of virtual power plants, highlighting the necessity of reforming the power industry. The generation scheduling strategy is optimized in light of the market transaction decision based on the elemental power contract to enhance the effective transfer of power resources in virtual power plants. Ultimately, value distribution is balanced through virtual power plants to maximize the economic benefits. After 4 hours of simulation, the experimental data shows that 75 MWh of electricity is generated by the thermal power system, 100 MWh by the wind power system, and 200 MWh by the dispatchable load system. Comparatively, the new electricity market transaction model based on the virtual power plant has an actual generation capacity of 250MWh. In addition, the daily load power of the models of thermal power generation, wind power generation, and virtual power plant reported here are compared and analyzed. For a 4-hour simulation run, the thermal power generation system can provide 600 MW of load power, the wind power generation system can provide 730 MW of load power, and the virtual power plant-based power generation system can provide up to 1200 MW of load power. Therefore, the power generation performance of the model reported here is better than other power models. This study can potentially encourage a revised transaction model for the power industry market.

Indexed as

IndustryPower PlantsComputer SimulationElectricityWind

Identifiers

PMID37079540
PMCPMC10118147

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.