Facility planning and schedule design in the pandemic: Eliminating contacts at construction workplace.

Haoqing Wang, Wen Yi, Shuaian Wang

Open access · hybridAbstract read
In one paragraph

Article in Journal of cleaner production, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
0.5field-weighted citation impact, top 34% of its field
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed, 2 citations in OpenAlex.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

3 authors at 1 institution in 1 country.

Haoqing WangDepartment of Logistics and Maritime Studies, Faculty of Business, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China.
Wen YiDepartment of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China.
Shuaian WangDepartment of Logistics and Maritime Studies, Faculty of Business, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China.
Hong Kong Polytechnic University · HK

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The construction industry has been severely affected by the COVID-19 pandemic and the associated restrictions on person-to-person contacts issued by the government. A construction site usually has a high number of workers working at the same time; therefore, the question of how to ensure their safety during the pandemic-that is, how to protect them from getting infected-has become an urgent problem. In this study, we propose a bi-objective integer programming model to establish the optimal schedule plan under COVID-19 regulations. We develop a solution method and conduct numerical experiments to solve and validate our model. The optimal schedule plan can avoid contacts between workers of different groups while minimizing the total costs of complying with government policy. Our proposed model can be applied in practice to help project managers establish a reasonable and cost-effective schedule plan. This study contributes to reducing the operating costs of contractors and protecting the health of construction workers.

Indexed as

Cleaner productionConstruction managementCOVID-19Facility planSchedule design

Identifiers

PMID36789403
PMCPMC9911307
OpenAlexW4319984617

What OpenQuestion holds

Textmetadata
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.