Facility planning and schedule design in the pandemic: Eliminating contacts at construction workplace.
Article in Journal of cleaner production, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed, 2 citations in OpenAlex.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
3 authors at 1 institution in 1 country.
Funding
No grant is acknowledged in the PubMed record.
Abstract
The construction industry has been severely affected by the COVID-19 pandemic and the associated restrictions on person-to-person contacts issued by the government. A construction site usually has a high number of workers working at the same time; therefore, the question of how to ensure their safety during the pandemic-that is, how to protect them from getting infected-has become an urgent problem. In this study, we propose a bi-objective integer programming model to establish the optimal schedule plan under COVID-19 regulations. We develop a solution method and conduct numerical experiments to solve and validate our model. The optimal schedule plan can avoid contacts between workers of different groups while minimizing the total costs of complying with government policy. Our proposed model can be applied in practice to help project managers establish a reasonable and cost-effective schedule plan. This study contributes to reducing the operating costs of contractors and protecting the health of construction workers.