ArticleAnnals of operations research2023
An integrated fuzzy MCDM model for prioritizing strategies for successful implementation and operation of the bus rapid transit system.
Article in Annals of operations research, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
1 citing paper in PubMed.
- Evaluating solar power plant sites using integrated GIS and MCDM methods: a case study in Kermanshah Province.Scientific reports · 2025Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
5 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
The selection and prioritization of suitable strategies to address the challenges to the successful operation and implementation of the bus rapid transit (BRT) system is a common problem faced by practitioners and decision-makers. Recent research has widely discussed the issue, but such assessments have remained limited in the city of Dar es Salaam, Tanzania context, where there are mobility difficulties. The present study addresses this research gap and identifies the most critical challenges to BRT implementation and operation, and recommends the most appropriate strategy for overcoming them. Seven strategies are defined. To prioritize these strategies, five criteria are determined. An integrated multi-criteria decision-making model is introduced. Improved Fuzzy Step-Wise Weight Assessment Ratio Analysis based on the Bonferroni operator was used to determine the importance of the criteria. Measurement of alternatives and ranking according to compromise solution was applied to assess and rank the strategies. The results indicate that "frequent flooding at the Jangwani bridge bus terminal" and "long waiting time at bus stops" are the most critical challenges while the fourth alternative "strengthening the operation and management" is the appropriate strategy to be implemented for successful operation and implementation of the BRT system. After that, a five-phase sensitivity analysis is performed to observe the robustness of the proposed approach. The results indicate the flexibility and applicability of the proposed approach can address real-life problems. The proposed methodology in this work can be instrumental in assisting mass transit operators with the successful implementation and operation of the BRT system.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.