Techno-economic assessment of a central grid-connected wind farm in Ghana using RETScreen® Expert.

Samuel Sarpong Asamoah, Joseph Parbey, Isaac Kwasi Yankey, Alfred Awuah

Abstract read
In one paragraph

Article in Heliyon, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.

0numbers the graph read from it
0cells of the map it votes in
2citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

2 citing papers in PubMed.

  1. Review
  2. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Samuel Sarpong AsamoahDepartment of Energy Systems Engineering, Faculty of Engineering, Koforidua Technical University, Ghana.
Joseph ParbeyDepartment of Energy Systems Engineering, Faculty of Engineering, Koforidua Technical University, Ghana.
Isaac Kwasi YankeyDepartment of Energy Systems Engineering, Faculty of Engineering, Koforidua Technical University, Ghana.
Alfred AwuahDepartment of Environmental Management and Technology, Faculty of Built and Natural Resources, Koforidua Technical University, Ghana.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

This paper presents the technical, financial, and environmental impact assessment of a 50-MW (MW) utility-scale wind farm in Ghana at four locations: Anloga, Atiteti, Sege, and Denu. The monthly average wind speeds recorded at the locations were 6.01 m/s, 5.98 m/s, 5.46 m/s, and 5.17 m/s respectively at 60 m above ground level. Capacity factors of 24.9%, 24.4%, 20.6%, and 18.0% were obtained at the locations respectively. The Net Present Value (NPV) was the main financial metric employed to determine the viability of the projects. The results indicated that a potential utility-scale wind project is viable at all locations under study. Furthermore, the Electricity Exported to the Grid and the Electricity Export Rate (EER) had the highest impact of 0.63 and 0.62 on the NPV respectively and therefore these key parameters should be well considered before any potential project implementation.

Indexed as

Electricity production costGreenhouse gas emissionsInternal rate of returnNet present valueRETScreen ExpertSimple payback

Identifiers

PMID36685476
PMCPMC9851871

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.