ArticlePloS one2023
A study on optimization of delayed production mode of iron and steel enterprises based on data mining.
Article in PloS one, 2023. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
3 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Delayed production mode has been adopted by an increasing number of process production enterprises as a method to realize mass customization of multi-products. This paper used the convolutional neural network-long short-term memory artificial neural network algorithm (C-LSTM) in data mining technology to analyze and determine factors that have an impact on delayed production mode in the internal and external production and operation of enterprises. Combined with the actual production situation of iron and steel enterprises, a quantitative model of the delayed production was constructed. Lastly, data from a large iron and steel enterprise with good operation was used to verify the validity of the proposed model and analyze key influencing factors. According to the research, in scenarios of considering PDP alone, considering CODP alone, considering both PDP and CODP, considering PDP and CODP and using data mining technology to model, the matching degree of these methods with the actual situation of the enterprise is 31.8%, 61.4%, 71.6% and 86.6%, respectively. The numerical analysis results of the model based on data mining technology show that in delayed production, when customer service level improves or the delay penalty coefficient increases, the optimal locations of the product differentiation point (PDP) and customer order decoupling point (CODP) move toward the end of production, and the total cost increases gradually. When the difference in production cost or benefit of early delivery between the candidate locations of PDP and CODP is small, optimal locations of PDP and CODP are close to the beginning of the general and dedicated production processes. With an increase of cost difference or early delivery benefit, the optimal locations of PDP and CODP jumped to the end stage of the general and dedicated production processes, and the total cost begins to decrease.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.