Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects.
Article in International journal of environmental research and public health, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
4 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construction 4.0), with BIM as the main enabling technology. Thus, the objective of this article is the evaluation of the risk produced by Overhead Power Lines (OPL) through BIM integration. The OPL, its risk zones, the affected road, and the envelope resulting from the geometry of the necessary machines to build it were digitized, converging in a single model to perform a 4D risk analysis. The risks of the execution of the embankment and road surface of a road section passing through an OPL were analyzed by means of the collision of the envelope with its risk zones, resulting in an integration of their evaluation, to which was added the introduction of preventive measures and their re-evaluation. The parametric 3D modelling allowed a better definition of the risk zones and the BIM management minimized errors, providing traceability of decisions from the design phase, complying with health and safety regulations and applying the principle of Prevention through Design (PtD).