ArticleComputational intelligence and neuroscience2022
Application of BIM Technology in Prefabricated Buildings Based on Virtual Reality.
Article in Computational intelligence and neuroscience, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. It has been retracted, and should not be counted. Cited by 2 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
2 citing papers in PubMed.
- Theoretical design and experimental verification of control system for building material packaging unit based on risk management.Scientific reports · 2024Article
- Retracted: Application of BIM Technology in Prefabricated Buildings Based on Virtual Reality.Computational intelligence and neuroscience · 2023Article
Corrections and comments
- Retraction · 2023-08-02Concerns/Issues about Data · Concerns/Issues about Results and/or Conclusions · Concerns/Issues about Referencing/Attributions · Concerns/Issues about Peer Review · Investigation by Journal/Publisher · Investigation by Third Party · Paper Mill · Computer-Aided Content or Computer-Generated Content · Unreliable Results and/or Conclusions · · See also: https://pubpeer.com/publications/3E38A7818C5BADA413FA1B8E7E6016
- Retracted
Authors and funding
3 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Prefabricated construction is an emerging technology in the construction industry, which can effectively meet the construction scale requirements of construction projects. It can also shorten the construction time and reduce unnecessary consumption of construction resources. The introduction of BIM + VR technology into the prefabricated construction industry will improve and improve the construction of the relevant construction industry chain, architectural visualization design, architectural virtualization construction, project cost management, and production operations. In particular, the application of BIM + VR technology to the construction of prefabricated buildings can further refine the entire construction process and improve the overall quality of the project. The application advantages of these two technologies are analyzed, and the practical application of advanced technologies in building construction is discussed for reference.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.