Evidence map›Paper›PMID 36225548›Full record

ArticleComputational intelligence and neuroscience2022

Application of BIM Technology in Prefabricated Buildings Based on Virtual Reality.

Wei Zheng, Yong Ye, Hongbing Zang

RetractedAbstract readRetracted Publication
In one paragraph

Article in Computational intelligence and neuroscience, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. It has been retracted, and should not be counted. Cited by 2 papers.

0numbers the graph read from it
0cells of the map it votes in
2citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

2 citing papers in PubMed.

  1. Article
  2. Article
4 · The record

Corrections and comments

5 · Who and what money

Authors and funding

3 authors.

Wei ZhengConstruction Management and Real Estate Department, Tongji University, Shanghai 200092, China.ORCID https://orcid.org/0000-0002-7553-300X
Yong YeConstruction Management and Real Estate Department, Tongji University, Shanghai 200092, China.
Hongbing ZangConstruction Management and Real Estate Department, Tongji University, Shanghai 200092, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Prefabricated construction is an emerging technology in the construction industry, which can effectively meet the construction scale requirements of construction projects. It can also shorten the construction time and reduce unnecessary consumption of construction resources. The introduction of BIM + VR technology into the prefabricated construction industry will improve and improve the construction of the relevant construction industry chain, architectural visualization design, architectural virtualization construction, project cost management, and production operations. In particular, the application of BIM + VR technology to the construction of prefabricated buildings can further refine the entire construction process and improve the overall quality of the project. The application advantages of these two technologies are analyzed, and the practical application of advanced technologies in building construction is discussed for reference.

Indexed as

Construction IndustryVirtual RealityTechnology

Identifiers

PMID36225548
PMCPMC9550401

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.