Evidence map›Paper›PMID 36201516›Full record

ArticlePloS one2022

Research on urban path selection of construction vehicles based on bi-objective optimization.

Mengkai Liu, Zepeng Xu

Abstract read
In one paragraph

Article in PloS one, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

2 authors.

Mengkai LiuEvergrande School of Management, Wuhan University of Science and Technology, Wuhan, Hubei, China.ORCID 0000-0001-9442-8216
Zepeng XuEvergrande School of Management, Wuhan University of Science and Technology, Wuhan, Hubei, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

With the implementation of urban central rail transit and old city reconstruction projects, construction vehicles frequently enter and depart the urban area. And because of its large volume and other characteristics, it increases the risk probability and severity of urban traffic accidents. This study takes the transportation path selection of construction vehicles as the breakthrough point, weighs the transportation efficiency and safety of construction vehicles, establishes a bi-objective optimization model, involving constraints such as height limit, weight limit, speed limit, direction limit and traffic limit and uses genetic algorithm to solve it. Finally, through case analysis, the user preference is adjusted to conduct functional test and description of the model. The results indicate that the model has the function of transportation vehicle path optimization. In the meantime, compared with the safest route, the time-consuming of the optimal route decreases by 16% and the risk increases by 7.4%, while the time-consuming of it increases by 5% and the risk decreases by 15.4% compared with the shortest route. Moreover, the corresponding coefficients of time-consuming and safety preference can reach about 0.65, and the relevant stakeholders have high acceptance of the route. Further improvement of construction vehicle management mechanism based on path optimization is one of the limited ways to effectively improve the current situation of construction vehicle management.

Indexed as

Accidents, TrafficTransportationCitiesMotor Vehicles

Identifiers

PMID36201516
PMCPMC9536627

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.