ArticleNature communications2022
Understanding Braess' Paradox in power grids.
Article in Nature communications, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 5 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
5 citing papers in PubMed, 41 citations in OpenAlex.
- Effective graph resistance as cumulative heat dissipation.Nature communications · 2026Article
- Optimization of power grid material warehousing and supply chain distribution path planning based on improved PSO algorithm.Scientific reports · 2025Article
- Modeling and analysis of the coupling effect for large-scale multi-band optical networks.Scientific reports · 2025Article
- Robust design of bicycle infrastructure networks.Scientific reports · 2025Article
- Collective behavior of higher-order globally coupled oscillatory networks in response to positive and negative couplings.Frontiers in network physiology · 2025Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
8 authors at 4 institutions in 4 countries.
Funding
Abstract
The ongoing energy transition requires power grid extensions to connect renewable generators to consumers and to transfer power among distant areas. The process of grid extension requires a large investment of resources and is supposed to make grid operation more robust. Yet, counter-intuitively, increasing the capacity of existing lines or adding new lines may also reduce the overall system performance and even promote blackouts due to Braess' paradox. Braess' paradox was theoretically modeled but not yet proven in realistically scaled power grids. Here, we present an experimental setup demonstrating Braess' paradox in an AC power grid and show how it constrains ongoing large-scale grid extension projects. We present a topological theory that reveals the key mechanism and predicts Braessian grid extensions from the network structure. These results offer a theoretical method to understand and practical guidelines in support of preventing unsuitable infrastructures and the systemic planning of grid extensions.
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.