ArticleComputational intelligence and neuroscience2022
Dematel-ISM-Based Study of the Impact of Safety Factors on Urban Rail Tunnel Construction Projects.
Article in Computational intelligence and neuroscience, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
1 citing paper in PubMed.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
4 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
The factors affecting urban rail tunnel construction projects are very complex and are influenced by many factors such as the social environment, the construction process, and the way construction is managed. These influencing factors interact with each other, leading to the complexity of the development risks of this type of project. However, at present, the research on engineering construction risk is mainly focused on the field of housing construction, and there are few researches on the risk of urban tunnel construction. At the same time, with the continuous development of urbanization, the coverage of urban underground rail transport is increasing, so it is of great theoretical and practical significance to study the construction process of urban underground tunnels. This paper uses the literature collection method and the LDA model to initially identify the impact factors, and on this basis, the final set of evaluation impact factors is determined by means of expert interviews. Based on the set of influencing factors, the Dematel-ISM model was used to obtain a comprehensive analysis of the factors affecting urban rail tunnel construction projects by comparing topological maps and obtaining a Dematel-ISM model diagram with a cause-effect reachable hierarchy. Finally, the results obtained are applied to the actual development to verify the validity of the model. The results of the study show that construction operation, sequence arrangement, and procedure selection are the key influencing factors for safety risks in urban rail tunnel construction projects.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.