ArticlePloS one2022
Pandora's Box: A spatiotemporal assessment of elephant-train casualties in Assam, India.
Article in PloS one, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 3 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
3 citing papers in PubMed, 6 citations in OpenAlex.
- A multi-scale ensemble machine learning framework for assessing human-elephant conflict in the Brahmaputra flood plain.Scientific reports · 2026Article
- Two Decades of Human-Elephant Conflict in Jharkhand: Spatial and Ecological Drivers of Human Fatalities.Ecology and evolution · 2025Article
- Memory-Based Navigation in Elephants: Implications for Survival Strategies and Conservation.Veterinary sciences · 2025Review
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
2 authors at 1 institution in 1 country.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Railways are an indispensable component of sustainable transportation systems, but also exact a toll on wildlife. Wild Asian elephants are often killed by trains in Assam, India, where we assess temporal variations in the occurrences of elephant-train collisions (ETCs) and casualties during 1990-2018. This study also assesses spatially varying relationships between elephant-train collision (ETC) rates and elephant and train densities in the adjoining 10 km2 grid cells of 11 prioritized railroad segments using ordinary least squares (OLS) and geographically weighted regression (GWR) models. The temporal analysis indicated that ETCs spiked at certain hours and months. The adult and calf elephant casualties on the railroads were found to be two to fivefold high during the post monsoon season compared to other seasons. During the operation period of meter gauge railroads (1990-1997), the proportions of ETCs and casualties were only 15.6% and 8.7% respectively. However, these increased substantially to 84.4% and 91.3% respectively during the operation of broad gauge railroads (1998-2018). The OLS model indicated that both elephant and train densities explained 37% of the variance of ETC rate, while GWR model showed 83% of the variance of ETC rate. The local coefficient values of GWR indicated that both the predictor variables interplayed significantly and positively to determine ETC rates in the Mariani-Nakachari and Khatkhati-Dimapur railroad segments. However, the relationship between ETC rate and elephant density is significantly negative in the Habaipur-Diphu railroad, implying that the elephant population along this railroad stretch is significantly affected by railways through large scale ETCs. Hence, there is an urgent need to address long-term mitigation strategies so that elephants can be conserved by providing safe passages and survival resources along railway lines.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.