SynthesisThe international journal of behavioral nutrition and physical activity2022
Impacts of new cycle infrastructure on cycling levels in two French cities: an interrupted time series analysis.
Synthesis in The international journal of behavioral nutrition and physical activity, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers, 1 of them a synthesis that pooled it.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
2 citing papers in PubMed, 1 synthesis or guideline pooled it.
- The effectiveness of new urban trail infrastructure on physical activity and active transportation: a systematic review and meta-analysis of natural experiments.The international journal of behavioral nutrition and physical activity · 2025Pooled it
- Effects of bicycle infrastructure interventions on physical activity in the general population: rapid review.BMC public health · 2026Review
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
5 authors.
Funding
Abstract
backgroundCities globally have started to make substantial investment in more sustainable forms of transportation. We aimed to evaluate whether the construction of new cycling infrastructure in Paris and Lyon, France, affected population cycling activity along new or improved routes.
methodsRoutinely collected cycle count data from January 2014 to March 2020 were acquired for the cities of Paris and Lyon. Improvements were identified at 15 locations with 6 months of pre- and post-intervention data. Comparison streets were chosen within Paris or Lyon for which pre-intervention trends in cycling were similar to those at intervention sites. Controlled interrupted time series analyses and autocorrelation were performed adjusting for seasonality. Random-effects meta-analysis combined results across streets within each city and overall.
resultsOn average, cycling counts/day increased on both intervention and control streets in Paris and Lyon. In general, results of the ITS analysis indicated no significant change in the level or trend as a result of the improvements in either city. Meta-analysis suggested that intervention streets in Paris had a larger positive pooled effect size for level change (218 cycle counts, 95% CI -189, 626, I
conclusionsThe findings suggest that improving or constructing new cycle lanes may be necessary but not sufficient to induce significant changes in cycling levels. There is a need to understand how context, intervention design and other complementary interventions can improve the effectiveness of new cycling infrastructure.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.