BIM-based task and motion planning prototype for robotic assembly of COVID-19 hospitalisation light weight structures.

Yifan Gao, Jiawei Meng, Jiangpeng Shu, Yuanchang Liu

Abstract read
In one paragraph

Article in Automation in construction, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.

0numbers the graph read from it
0cells of the map it votes in
2citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

2 citing papers in PubMed.

  1. Review
  2. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Yifan GaoCollege of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China.
Jiawei MengDepartment of Mechanical Engineering, University College London, London WC1E 6BT, United Kingdom.
Jiangpeng ShuCollege of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China.
Yuanchang LiuDepartment of Mechanical Engineering, University College London, London WC1E 6BT, United Kingdom.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Fast transmission of COVID-19 led to mass cancelling of events to contain the virus outbreak. Amid lockdown restrictions, a vast number of construction projects came to a halt. Robotic platforms can perform construction projects in an unmanned manner, thus ensuring the essential construction tasks are not suspended during the pandemic. This research developed a BIM-based prototype, including a task planning algorithm and a motion planning algorithm, to assist in the robotic assembly of COVID-19 hospitalisation light weight structures with prefabricated components. The task planning algorithm can determine the assembly sequence and coordinates for various types of prefabricated components. The motion planning algorithm can generate robots' kinematic parameters for performing the assembly of the prefabricated components. Testing of the prototype finds that it has satisfactory performance in terms of 1) the reasonableness of assembly sequence determined, 2) reachability for the assembly coordinates of prefabricated components, and 3) capability to avoid obstacles.

Indexed as

Building information modellingCOVID-19 pandemicHospitalisation facilityMotion planningRobotic construction

Identifiers

PMID35607382
PMCPMC9117582

What OpenQuestion holds

Textmetadata
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.