Predicting Timelines in Healthcare Infrastructure Projects: Learnings From an Apex Tertiary Care Teaching Hospital in North India.

Prakash S, Angel Rajan Singh, Sidhartha Satpathy, Jean Patrice Khoshbin

Open access · diamondAbstract read
In one paragraph

Article in Cureus, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
0.5field-weighted citation impact, top 38% of its field
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed, 3 citations in OpenAlex.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors at 2 institutions in 2 countries.

Prakash SDepartment of Hospital Administration, All India Institute of Medical Sciences, New Delhi, IND.
Angel Rajan SinghDepartment of Hospital Administration, All India Institute of Medical Sciences, New Delhi, IND.
Sidhartha SatpathyDepartment of Hospital Administration, All India Institute of Medical Sciences, New Delhi, IND.
Jean Patrice KhoshbinOffice of Space and Facilities Management (OSFM), National Cancer Institute, Rockville, USA.
All India Institute of Medical Sciences · INOffice of the Director · US

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Aim Healthcare infrastructure projects are a requirement for the progress of the country. The aim of this study was to identify major completed healthcare infrastructure projects in a tertiary teaching hospital in Northern India and to find out the various factors that influenced the success or failures and the cost and time overrun during the project implementation. Materials and methods Periodical review meetings were conducted, right from the planning to the execution and commissioning of these projects. All these had been documented as minutes of the meetings, and the records of the same had been maintained. The study comprised of studying all these documents in detail and finding an answer to the research questions. Results Four major completed projects of a tertiary medical institute of India, All India Institute of Medical Sciences (AIIMS), New Delhi, India, were studied. These were the new Outpatient Department (OPD) Block, Burns and Plastic Surgery Block (BPS), Maternal and Child Health Block (MCH), and National Cancer Institute (NCI). Our study revealed that there was no dearth of funds, and hence, there was no cost overrun in any of the projects. Whenever the funds had to be reworked, the funds that were asked for were released. However, there was a considerable time overrun in all the projects ranging from about one to four years. The various reasons that could be attributed to this are the delay in obtaining statutory clearances, political interference, communication hurdles, improper planning, introducing a project officer late into the project, safety concerns, and the COVID-19 pandemic. Conclusions This study focuses mainly on the very important hurdles that were faced during the implementation of the projects and tries to suggest an average time frame for various activities for project implementation in a healthcare project in the Indian scenario. This can be taken as blueprints while planning newer healthcare projects of this magnitude.

Indexed as

healthcare project managementinfrastructureplanningstatutory requirements for hospital constructionstime overrun

Identifiers

PMID35529306
PMCPMC9072285
OpenAlexW4225393635

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.