Propagation network of tailings dam failure risk and the identification of key hazards.
Article in Scientific reports, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
5 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
The tailings dam system is complex, and the dam structure changes continuously over time, which can make it difficult to identify key hazards of failure and characterize the accident formation process. To solve the above problems, based on complex network theory, the paper uses the identified hazards and the relationship between hazards to construct the propagation network of tailings dam failure risk (PNTDFR). The traditional analysis methods of network centrality usually focus on one aspect of the information of the network, while it cannot take into account to absorb the advantages of different methods, resulting in the difference between identified key nodes and real key hazards. To find the key hazards of tailing dam failure, based on the characteristics of multi-stage propagation of failure risk, the paper proposes a multi-stage collaborative hazard remediation method (MCHRM) to determine the importance of hazard nodes by absorbing the advantages of different centrality methods under different hazard remediation (deletion) ratios. The paper applies the above methods to Feijão Dam I. It can be found that when the priority remediation range is increased to 45%, the key hazards obtained by the MCHRM will cover all the causes of accidents proposed by the Dam I failure investigation expert group. Besides, the paper compares the monitoring data, daily inspection results and safety evaluation information of key hazards with the 'Grading standards of hazard indicators', and obtains the formation process of the Dam I failure and 30 key hazards in trigger state.