ArticleSensors (Basel, Switzerland)2022
A Multi-Objective Task Scheduling Strategy for Intelligent Production Line Based on Cloud-Fog Computing.
Article in Sensors (Basel, Switzerland), 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 4 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
4 citing papers in PubMed.
- Toward intelligent IoT scheduling with quantum-inspired latent models for energy and latency optimization.Scientific reports · 2026Article
- Multi-Agent Deep Reinforcement Learning for Joint Task Offloading and Resource Allocation in IIoT with Dynamic Priorities.Sensors (Basel, Switzerland) · 2025Article
- EEOA: Cost and Energy Efficient Task Scheduling in a Cloud-Fog Framework.Sensors (Basel, Switzerland) · 2023Article
- Heuristic Routing Algorithms for Time-Sensitive Networks in Smart Factories.Sensors (Basel, Switzerland) · 2022Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
7 authors.
Funding
Abstract
With the widespread use of industrial Internet technology in intelligent production lines, the number of task requests generated by smart terminals is growing exponentially. Achieving rapid response to these massive tasks becomes crucial. In this paper we focus on the multi-objective task scheduling problem of intelligent production lines and propose a task scheduling strategy based on task priority. First, we set up a cloud-fog computing architecture for intelligent production lines and built the multi-objective function for task scheduling, which minimizes the service delay and energy consumption of the tasks. In addition, the improved hybrid monarch butterfly optimization and improved ant colony optimization algorithm (HMA) are used to search for the optimal task scheduling scheme. Finally, HMA is evaluated by rigorous simulation experiments, showing that HMA outperformed other algorithms in terms of task completion rate. When the number of nodes exceeds 10, the completion rate of all tasks is greater than 90%, which well meets the real-time requirements of the corresponding tasks in the intelligent production lines. In addition, the algorithm outperforms other algorithms in terms of maximum completion rate and power consumption.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.