Evidence map›Paper›PMID 35178079›Full record

ArticleComputational intelligence and neuroscience2022

Interpretable Short-Term Electrical Load Forecasting Scheme Using Cubist.

Jihoon Moon, Sungwoo Park, Seungmin Rho, Eenjun Hwang

Abstract read
In one paragraph

Article in Computational intelligence and neuroscience, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Jihoon MoonDepartment of Industrial Security, Chung-Ang University, Seoul, Republic of Korea.ORCID https://orcid.org/0000-0001-9524-5729
Sungwoo ParkSchool of Electrical Engineering, Korea University, Seoul, Republic of Korea.
Seungmin RhoDepartment of Industrial Security, Chung-Ang University, Seoul, Republic of Korea.ORCID https://orcid.org/0000-0003-1936-6785
Eenjun HwangSchool of Electrical Engineering, Korea University, Seoul, Republic of Korea.ORCID https://orcid.org/0000-0002-0418-4092

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Daily peak load forecasting (DPLF) and total daily load forecasting (TDLF) are essential for optimal power system operation from one day to one week later. This study develops a Cubist-based incremental learning model to perform accurate and interpretable DPLF and TDLF. To this end, we employ time-series cross-validation to effectively reflect recent electrical load trends and patterns when constructing the model. We also analyze variable importance to identify the most crucial factors in the Cubist model. In the experiments, we used two publicly available building datasets and three educational building cluster datasets. The results showed that the proposed model yielded averages of 7.77 and 10.06 in mean absolute percentage error and coefficient of variation of the root mean square error, respectively. We also confirmed that temperature and holiday information are significant external factors, and electrical loads one day and one week ago are significant internal factors.

Indexed as

ElectricityNeural Networks, ComputerForecastingTemperature

Identifiers

PMID35178079
PMCPMC8847022

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.