Evidence map›Paper›PMID 35073363›Full record

ArticlePloS one2022

Study on overburden failure law and surrounding rock deformation control technology of mining through fault.

Chunlin Zeng, Yuejin Zhou, Leiming Zhang, Donggui Mao, Kexin Bai

Open access · goldAbstract read
In one paragraph

Article in PloS one, 2022. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 4 papers.

0numbers the graph read from it
0cells of the map it votes in
4citing papers in PubMed
2.3field-weighted citation impact, top 14% of its field
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

4 citing papers in PubMed, 15 citations in OpenAlex.

  1. Article
  2. Article
  3. Article
  4. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors at 1 institution in 1 country.

Chunlin ZengState Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining & Technology, Xuzhou, China.
Yuejin ZhouState Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining & Technology, Xuzhou, China.ORCID 0000-0001-6045-9567
Leiming ZhangState Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining & Technology, Xuzhou, China.
Donggui MaoState Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining & Technology, Xuzhou, China.
Kexin BaiState Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining & Technology, Xuzhou, China.
China University of Mining and Technology · CN

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

In the mining process of working face, the additional stress generated by the fault changes the law of roadway deformation and failure as well as the law of overburden failure. Aiming at the influence of the fault in the mining process of working face, this study introduced the geological strength index (GSI) to analyze the stress distribution in the elastic-plastic zone of the surrounding rock of the roadway. And similar experiments under different engineering backgrounds were combined to study the characteristics of overburden movement and stress evolution. Based on the conclusions obtained, the roadway support scheme was designed. This study shows that, compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The "three zones" characteristics of the overburden movement disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advanced mining stress on the working face is extended from 20m to 30m. The instability range of roadway surrounding rock is exponentially correlated with the rupture degree of the surrounding rock. Through the introduction of GSI, the critical instability range of roadway surrounding rock is deduced to be 2.32m. According to the conclusion, the bolt length and roadway reinforced support length are redesigned. Engineering application shows that the deformation rate of the roadway within 60 days is controlled below 0.1~0.5mm/d, the deformation amount is controlled within 150mm, and the roadway deformation is controlled, which generally meets the requirements of use. The research results provide guidance and reference for similar roadway support.

Indexed as

Models, TheoreticalCoalCoal MiningEngineeringHumansSoil PollutantsCoalSoil Pollutants

Identifiers

PMID35073363
PMCPMC8786183
OpenAlexW4206981954

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.