ArticleComputational intelligence and neuroscience2021
Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation.
Article in Computational intelligence and neuroscience, 2021. The graph could read no effect estimate from its abstract, so it casts no vote on the map. It has been retracted, and should not be counted. Cited by 3 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
3 citing papers in PubMed.
- Construction and application of an applicability evaluation system for garlic planters based on fuzzy comprehensive evaluation.PloS one · 2023Article
- Retracted: Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation.Computational intelligence and neuroscience · 2023Article
- Exploring the Application of BIM Technology in the Whole Process of Construction Cost Management with Computational Intelligence.Computational intelligence and neuroscience · 2022Review
Corrections and comments
- Retraction · 2023-07-26Concerns/Issues about Data · Concerns/Issues about Referencing/Attributions · Concerns/Issues about Results and/or Conclusions · Concerns/Issues about Peer Review · Investigation by Journal/Publisher · Unreliable Results and/or Conclusions ·
- Retracted
Authors and funding
3 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Nowadays, with the leap-forward development of computer technology and the transformation of information technology management concepts, China's construction industry is quietly entering the era of refined management. Accurate estimation and cost control have become among the key considerations of the construction industry. For the calculation of engineering quantity, there are already many software devices that can be used for the calculation of engineering structure quantity, which means that the incorrect operation of personnel has been reduced to some extent, improving the work efficiency and measurement accuracy. The purpose of this paper is to solve the problems of computational missing, computational errors, inefficiency, data loss, and repetitive system in traditional computing based on the advantages of BIM computing system, which provide a reliable basis for cost forecasting and control. At the same time, using BMI calculation system to solve the problem of steel reinforcement in construction engineering, as well as the use of personnel, the existing calculation software still needs a lot of time and energy. We proposed a comprehensive evaluation study of reinforcement calculation in domestic construction engineering BIM calculation system based on a fuzzy comprehensive evaluation. This paper first summarizes the BIM calculation system of construction engineering, uses fuzzy comprehensive evaluation system as an important evaluation index system in domestic construction engineering BIM calculation system, through the judgment of various factors affecting the actual effect of the calculation system, and uses the fuzzy evaluation system combined with a case to demonstrate the superiority of the proposed research. Therefore, through the above research and experiments, it is concluded that the research method of this paper solves many problems in the process of engineering structure reinforcement calculation and provides a good reference method for the establishment of comprehensive evaluation system of reinforcement calculation, as well as providing an effective validation for the widespread use of BIM technology in the construction industry. Finally, it is also beneficial for users to comprehensively evaluate the BIM calculation system of the construction industry and provide a basic reference condition for different industries to use and choose BIM calculation systems.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.