Evidence map›Paper›PMID 34950199›Full record

ArticleComputational intelligence and neuroscience2021

Intelligent Building Construction Management Based on BIM Digital Twin.

Yi Jiang

Abstract read
In one paragraph

Article in Computational intelligence and neuroscience, 2021. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.

0numbers the graph read from it
0cells of the map it votes in
2citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

2 citing papers in PubMed.

  1. Article
  2. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

1 author.

Yi JiangHenan Finance University, Zhengzhou 451464, China.ORCID https://orcid.org/0000-0003-3828-9586

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

In order to improve the construction effect of intelligent buildings, this paper combines the BIM digital twin technology to construct the overall structure of the building construction operation and maintenance system driven by the BIM digital twin. Moreover, this paper conducts intelligent simulation of the construction process of the building and combines the construction process of the intelligent building to apply the BIM digital twin technology to the construction management of the intelligent building. In addition, this paper uses BIM to simulate the construction process. After the construction management plan is developed, BIM can be used to simulate the construction, find the problems in the construction, and formulate a reliable construction management plan in time. Through simulation experiment research, it can be known that the intelligent building construction management model based on BIM digital twin proposed in this paper can help the deployment of intelligent building construction process in many aspects and help improve the efficiency of building construction management.

Indexed as

Computer Simulation

Identifiers

PMID34950199
PMCPMC8691975

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.