Evidence map›Paper›PMID 34947359›Full record

ArticleMaterials (Basel, Switzerland)2021

Effect of Water Condensate on Corrosion of Wires in Ungrouted Ducts.

Radoslav Ponechal, Peter Koteš, Daniela Michálková, Jakub Kraľovanec, František Bahleda

Open access · goldAbstract read
In one paragraph

Article in Materials (Basel, Switzerland), 2021. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
0.7field-weighted citation impact, top 32% of its field
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed, 7 citations in OpenAlex.

  1. State of Prestressing Analysis of 62-Year-Old Bridge.Materials (Basel, Switzerland) · 2022
    Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors at 1 institution in 1 country.

Radoslav PonechalDepartment of Building Engineering and Urban Planning, Faculty of Civil Engineering, University of Zilina, Univerzitna 8215/1, 010 26 Zilina, Slovakia.
Peter KotešDepartment of Structures and Bridges, Faculty of Civil Engineering, University of Zilina, Univerzitna 8215/1, 010 26 Zilina, Slovakia.ORCID 0000-0001-5069-888X
Daniela MichálkováDepartment of Building Engineering and Urban Planning, Faculty of Civil Engineering, University of Zilina, Univerzitna 8215/1, 010 26 Zilina, Slovakia.ORCID 0000-0002-0398-1815
Jakub KraľovanecDepartment of Structures and Bridges, Faculty of Civil Engineering, University of Zilina, Univerzitna 8215/1, 010 26 Zilina, Slovakia.ORCID 0000-0001-6244-4780
František BahledaLaboratory of Civil Engineering, Faculty of Civil Engineering, University of Zilina, Univerzitna 8215/1, 010 26 Zilina, Slovakia.
University of Žilina · SK

Funding

Cultural and Educational Grant Agency Kega 020ŽU-4/2021Slovak Grant Agency VEGA-1/0045/19Slovak Grant Agency VEGA-1/0048/22Slovak Grant Agency VEGA-1/0306/21Slovak Grant Agency VEGA-1/0673/20Slovak Research and Development Agency APVV-14-0772
6 · The paper itself

Abstract

In the case of existing prestressed concrete structures, information about the actual state of prestressing is an important basis for determining their load-carrying capacity, as well as remaining service lifetime. This is even more important in the case of existing prestressed concrete bridges, which are exposed to a more aggressive environment than the other prestressed concrete structures. The level of prestressing is affected and reduced by prestress losses at a given time. In calculating the internal forces and stresses, required for the assessment of the Ultimate Limit State and the Serviceability Limit State, it is necessary to know not only the prestressing level but also the cross-sectional area of the prestressing steel (wire, strand or cable), which can change in time due to corrosion. In practice, in the case of the pre-tensioned concrete members, it has often happened in the past that cable ducts have been grouted only partially, or not at all, due to poor grouting technology. Experts did not realize what this could cause in the future-the penetration of water with aggressive agents directly into the cable duct and consequently corrosion of the prestressing steel, which means not increased protection of the steel, but rather acceleration of degradation. On the other hand, in many cases, corrosion also occurs in ducts that are not grouted and no water has entered them. This paper deals with this phenomenon-the formation of corrosion of prestressing steel in cable ducts in ungrouted ducts due to moisture. This problem was investigated experimentally and numerically in the simulation program ESP-r. Experimental measurements and numerical simulations have shown that the water vapor condenses in the cable ducts, which can subsequently cause corrosion of the prestressing steel.

Indexed as

assessmentcorrosionhumiditypost-tensioned bridgeprestressing steelsimulationwater-condensate

Identifiers

PMID34947359
PMCPMC8706164
OpenAlexW4200257701

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.