A three-dimensional intelligent engineering management and control system for the construction of a long-span valve hall project based on a microservice architecture.

Qinghe Zeng, WeiHua Ming, Jin Luo, SongAn Zhang, Wei Hu, Zhen Liu, CuiYing Zhou

Abstract read
In one paragraph

Article in PloS one, 2021. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

7 authors.

Qinghe ZengChina Southern Power Grid Ehv Power Transmission Company, Guangzhou, China.
WeiHua MingSchool of Civil Engineering, Sun Yat-sen University, Guangzhou, China.
Jin LuoSchool of Civil Engineering, Sun Yat-sen University, Guangzhou, China.
SongAn ZhangSchool of Civil Engineering, Sun Yat-sen University, Guangzhou, China.
Wei HuSchool of Civil Engineering, Sun Yat-sen University, Guangzhou, China.
Zhen LiuSchool of Civil Engineering, Sun Yat-sen University, Guangzhou, China.ORCID 0000-0003-0083-8754
CuiYing ZhouSchool of Civil Engineering, Sun Yat-sen University, Guangzhou, China.ORCID 0000-0003-1337-7424

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Three-dimensional intelligent engineering management and control systems (EMCS) based on the browser/server (B/S) model are an important part of intelligent engineering development. These systems are used for solving the difficulties encountered in engineering management with frequent cross-specialties and are vital tools for data exchange and service sharing among multiple departments. Currently, most engineering management and control systems are based on service-oriented architectures (SOAs). The integration mechanism and high coupling of SOAs leads to the reduction in system expansibility, service quality and service safety of the engineering system, making it difficult for these architectures to serve the construction of long-span valve hall engineering. To address these concerns, the management and application technology of the multidisciplinary data of valve hall engineering based on a microservice architecture (MSA) is proposed to improve the management efficiency of engineering data. A 3D integration modeling method for valve hall engineering structures and geological environments is proposed to establish the topological association between engineering structures and geological environments, without increasing the amount of model data required. A 3D intelligent engineering management and control technology for the entire process of the construction of long-span valve hall engineering is proposed, which realizes the entire process simulation and control of engineering construction based on WebGL technology. Accordingly, a three-dimensional intelligent engineering management and control system for the entire construction process of a long-span valve hall project in Southeast China is established, which can effectively manage and apply the data, display and analyze the three-dimensional model, and control and make decisions regarding the construction schedule. This study provides support for the construction of "smart engineering", promotes information communication and transmission between different project units, and speeds up the transformation from traditional construction management relying on drawings to three-dimensional intelligent construction management based on cloud services.

Indexed as

CommunicationElectricityIntelligenceSoftwareChinaConstruction IndustryElectric Power SuppliesEngineeringHumans

Identifiers

PMID34860837
PMCPMC8641898

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.