Critical Success Factors of Safety Program Implementation in Construction Projects in Iraq.

Mohanad Kamil Buniya, Idris Othman, Riza Yosia Sunindijo, Ghanim Kashwani, Serdar Durdyev, Syuhaida Ismail, Maxwell Fordjour Antwi-Afari, Heng Li

Abstract readReview
In one paragraph

Review in International journal of environmental research and public health, 2021. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Empirical Research on the Critical Success Factors of Construction Program.Computational intelligence and neuroscience · 2022
    Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

8 authors.

Mohanad Kamil BuniyaDepartment of Civil & Environmental Engineering, University Technology PETRONAS, Seri Iskandar 32610, Malaysia.
Idris OthmanDepartment of Civil & Environmental Engineering, University Technology PETRONAS, Seri Iskandar 32610, Malaysia.ORCID 0000-0001-6822-8122
Riza Yosia SunindijoSchool of Built Environment, The University of New South Wales, Sydney, NSW 2052, Australia.ORCID 0000-0001-5679-8937
Ghanim KashwaniDivision of Engineering, New York University Abu Dhabi, P.O. Box 129188, Abu Dhabi 51133, United Arab Emirates.
Serdar DurdyevDepartment of Engineering and Architectural Studies, Ara Institute of Canterbury, Christchurch 8011, New Zealand.ORCID 0000-0003-1781-1830
Syuhaida IsmailRazak Faculty of Technology and Informatics, Universiti Teknologi Malaysia, Kuala Lumpur 541000, Malaysia.
Maxwell Fordjour Antwi-AfariDepartment of Civil Engineering, College of Engineering and Physical Sciences, Aston University, Birmingham B4 7ET, UK.ORCID 0000-0002-6812-7839
Heng LiDepartment of Building and Real Estate, The Hong Kong Polytechnic University, Room No. ZS734, Hung Hom, Kowloon, Hong Kong.ORCID 0000-0002-3187-9041

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The construction sector is recognized as one of the most dangerous industries in the world. The situation is worsening in Iraq, as a result of a lack of attention to safety in the building industry and the poor implementation of safety programs. This research aims to identify the critical safety factors (CSFs) of safety program implementation in the Iraqi construction industry. The CSFs were first identified from a review of literature before being verified by construction practitioners, using semi-structured interviews. A questionnaire, based on the verified CSFs, was distributed to construction practitioners in Iraq. Exploratory factor analysis (EFA) was used to analyze the quantitative data, and the results show that the CSFs can be categorized into four constructs: worker involvement, safety prevention and control system, safety arrangement, and management commitment. Following that, partial least square structural equation modelling (PLS-SEM) was executed to establish the connection between safety program implementation and overall project success. The result confirms that safety program implementation has a significant, positive impact on project success. This article contributes to knowledge and practice by identifying the CSFs for implementing safety programs in the Iraqi construction industry. The successful implementation of a safety program not only improves safety performance, but also helps to meet other project goals.

Indexed as

Construction IndustryFactor Analysis, StatisticalIraqSurveys and Questionnairesconstructioncritical success factorsIraqPLS-SEMsafety program

Identifiers

PMID34444218
PMCPMC8394966

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.