Evidence map›Paper›PMID 33568163›Full record

ArticleBMC medical informatics and decision making2021

Construction of exchange integrated information chain management model leading by information nurse for large instrument and equipment in operating room.

Jinghua Dai, Xiaoqiang Ren, Peng Wu, Xiangdong Wang, Jiang Li, Haiyan Bian, Lingai Ren, Chunmei Wu

Abstract read
In one paragraph

Article in BMC medical informatics and decision making, 2021. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

8 authors.

Jinghua DaiDepartment of Anesthesia Surgery, Shanxi Provincial People's Hospital, No. 29 of Twin Towers Street, Yingze District, Taiyuan, 030012, China.
Xiaoqiang RenDepartment of Information Office, Shanxi Provincial People's Hospital, Taiyuan, 030012, China.
Peng WuDepartment of Information Office, Shanxi Provincial People's Hospital, Taiyuan, 030012, China.
Xiangdong WangDepartment of Material Supply Department, Shanxi Provincial People's Hospital, Taiyuan, 030012, China.
Jiang LiDepartment of Material Supply Department, Shanxi Provincial People's Hospital, Taiyuan, 030012, China.
Haiyan BianDepartment of Anesthesia Surgery, Shanxi Provincial People's Hospital, No. 29 of Twin Towers Street, Yingze District, Taiyuan, 030012, China.
Lingai RenDepartment of Anesthesia Surgery, Shanxi Provincial People's Hospital, No. 29 of Twin Towers Street, Yingze District, Taiyuan, 030012, China.
Chunmei WuDepartment of Anesthesia Surgery, Shanxi Provincial People's Hospital, No. 29 of Twin Towers Street, Yingze District, Taiyuan, 030012, China. chunmeiwu337@163.com.ORCID 0000-0002-8846-4453

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

backgroundThis study aims to explore the information chain management model of large instrument and equipment inter-working in the operating room (OR) led by information nurses.

methodsThrough the chain management process of large instruments and equipment in the OR, which was based on information nurses, the management model of inter-working and integrating information chain was established, the key links were controlled, and the whole life cycle management of instruments and equipment from expected procurement to scrapping treatment was realized. Using the cluster sampling method, 1562 surgical patients were selected. Among these patients, 749 patients were assigned to the control group before the running mode, and 813 patients were assigned to the observation group after the running mode. The related indexes for large instrument and equipment management in the department before and after the running mode were compared.

resultsIn the observation group, the average time of equipment registration was (22.05 ± 2.36), the cost was reduced by 2220 yuan/year, and the satisfaction rate of the nursing staff was 97.62%. These were significantly better, when compared to the control group (P < 0.05). Furthermore, the awareness rate of the whole staff for equipment repair application was 95.12%, and the arrival time of maintenance personnel and the examination and approval time of equipment management were greatly shortened (P < 0.05).

conclusionThe integrated management model of large instrument and equipment interworking in the OR based on chain flow realizes the whole life cycle management of instruments and equipment, which is essential to improve management efficiency.

Indexed as

Operating RoomsSurgical InstrumentsHumansChain flowEquipment managementInformation nurseLarge instruments and equipmentOperating room

Identifiers

PMID33568163
PMCPMC7876801

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.