ArticleJournal - American Water Works Association2018
Design and Testing of USEPA'S Flint Pipe Rig for Corrosion Control Evaluation.
Article in Journal - American Water Works Association, 2018. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 4 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
4 citing papers in PubMed, 10 citations in OpenAlex.
- An evaluation of properly operated NSF/ANSI-53 Pb certified drinking water filters in Benton Harbor, MI.Journal of water and health · 2024Article
- A literature review of bench top and pilot lead corrosion assessment studies.AWWA water science · 2023Article
- A holistic approach to lead pipe scale analysis: Importance, methodology, and limitations.AWWA water science · 2022Article
- Theoretical equilibrium lead(II) solubility revisited: Open source code and practical relationships.AWWA water science · 2021Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
6 authors at 2 institutions in 1 country.
Funding
Abstract
The US Environmental Protection Agency's Office of Research and Development designed, fabricated, and installed four pipe rigs in Flint, Mich., to help the city optimize corrosion control. The lead service line (LSL) pipe loops were constructed of polyvinyl chloride pipe and fittings and welded steel channel frames. Each pipe rig consisted of four approximately 4 ft-long sections of 0.75 in. inside diameter lead pipe that were excavated from homes fed by the Flint distribution system. The rigs were operated on a set daily on/off schedule such that a specified amount of water passed through each pipe using a solenoid valve-operated timer system. Solenoid problems resulted in sporadic and enhanced daily flow volume (but no flow rate changes) that prevented restabilization of pipe scales. Lead levels were relatively sporadic and statistically different during this period. After the solenoids were replaced, the lead pipe rigs were successfully conditioned, and lead release with consistent influent water chemistry became relatively stable. Average lead levels across all 16 loops ranged between approximately 2 and 5 μg/L after the solenoid replacement. The lead results were consistent with levels measured from LSLs from homes in the city during sequential sampling efforts.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.