Dataset on sensitivity of water-energy nexus to Dez Dam power plant operation.
Article in Data in brief, 2020. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
1 citing paper in PubMed.
- Framing a novel holistic energy subsystem structure for water-energy-food nexus based on existing literature (basic concepts).Scientific reports · 2023Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
3 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
This article explains the time-series data for sensitivity of water-energy nexus to Dez Dam operation located at Dez basin in the southeast of Iran for a period of 54 years (648 months) from October 1964 to September 2018. The utilized data included outflow of the turbine, reservoir inflow, reservoir volume, evaporation, precipitation, spillway, total outflow of the reservoir, elevation, power generation and demand. In this article, operation of Dez Dam is examined for 54 hydrologic years (1964-2018), considering reducing the full supply level (FSL) gradually from its current value to the minimum possible value, increasing the minimum operating level (MOL) gradually to the maximum possible level and operating the Dam at a constant operating level (COL). Also, the concept of water-energy productivity (WEP), defined as the amount of energy produced per unit of water lost in the process, is proposed to measure water-energy nexus (WEN) to changing Dez Dam operation policy. Analysis of the WEN in the context of Dez Dam operation is imperative for improving decision making in the quest for efficient resource use and management.